Power production resumes from Upper Tamakoshi after 88 days
risingnepaldaily.com
. 12 month ago
By A Staff Reporter,Kathmandu, Dec. 26: Power production has partially resumed from the 456 MW Upper Tamakoshi Hydropower Project, the largest of the hydropower plants in operation in Nepal.
Comment
Liked by: